1. Clarify requirements and equipment types
- Production requirements
- Determine the daily/monthly production target (such as 100㎡/day or 5000㎡/month) and select the equipment model that matches the production capacity.
- Clarify product specifications (size, thickness, pattern complexity) and ensure that the equipment supports custom molds or processes.
- Device Type
- Fully automatic production line : suitable for large-scale production, with a high degree of automation, and requires supporting equipment such as raw material mixing, pressing, curing, and polishing.
- Semi-automatic/manual equipment : suitable for small businesses or initial investment, with more manual involvement and lower costs.
- Special process equipment : If you need to produce special-shaped bricks, permeable terrazzo, etc., confirm that the equipment is compatible with special processes (such as vacuum vibration and high-pressure forming)

2. Technical parameters of core equipment
- Suppression system
- Pressure range (recommended ≥200 tons), high pressure ensures the density of bricks.
- Pressing method (hydraulic/mechanical), the hydraulic system has higher stability.
- Mold compatibility ( quick mold change design , mold material hardness).
- Molding accuracy
- Dimensional error (within ±0.5mm is preferred).
- Surface flatness (glossiness ≥ 90 degrees after polishing).
- Energy consumption and efficiency
- Equipment power (such as total power ≤ 50kW) to reduce long-term electricity costs.
- Single molding cycle (for fully automatic lines, it is recommended that the cycle be ≤30 seconds/block).

3. Supplier Qualification Inspection
- Enterprise Qualification
- Verify business license, ISO certification, patent certificates (such as energy saving, intelligent control system patents).
- An equipment quality inspection report is required (in compliance with GB/T 15762-2020 and other building materials machinery standards).
- Cases and reputation
- Visit at least 3 customers' production sites to observe the equipment operation stability and finished product quality.
- Check industry forums and social media reviews, and be wary of “zero complaints” propaganda (which may involve fake orders).
- R&D Capabilities
- Confirm whether the company provides technology upgrade services (such as IoT remote monitoring functions).
- Ask if there are customized solutions for environmental policies (such as solid waste utilization).
4. After-sales service guarantee
- Warranty Terms
- The warranty period for core components (hydraulic system, electric control cabinet) is ≥ 2 years, and the warranty period for wearing parts (molds, belts) is ≥ 6 months.
- is responsible for labor and parts costs during the warranty period .
- Technical Support
- Request installation and commissioning video guidance + on-site technical support within 72 hours.
- Confirm whether formulation guidance (aggregate ratio, resin curing time optimization) is provided.
- Accessories Supply
- Suppliers must commit to delivering common accessories (cylinder seals, sensors) within 24 hours.
- Provide 3D drawings of the equipment for reference by third parties during repairs.
5. Cost and Investment Analysis
- Equipment cost
- Reference price for fully automatic line: 800,000-3,000,000 yuan (depending on the degree of automation); reference price for semi-automatic line: 200,000-500,000 yuan.
- Compare quotes from multiple companies and be wary of "low price traps" (which may simplify the structure or use second-hand parts).
- Hidden costs
- Calculate the land cost of the equipment ( factory planning is required for areas over 200 m2 ).
- Estimate scrap rate (≤3% for high-quality equipment).
- Return on Investment (ROI)
- Based on the current market price of terrazzo tiles (50-150 yuan/㎡), the payback period is calculated (usually 2-4 years).
VI. Safety and environmental protection requirements
- Security certification
- The equipment must pass CE certification (required for export) or GB 5226.1 electrical safety standard.
- Safety designs such as emergency brake devices and protective covers must be complete.
- Environmental Compliance
- The dust collection system efficiency is ≥95% and the noise level is ≤75 dB.
- The equipment must support the recycling of solid waste aggregates (such as marble waste).
VII. Key Terms of the Contract
- Payment Methods
- It is recommended to pay in installments (such as 30% deposit + 60% after acceptance + 10% quality assurance deposit).
- Specify the penalty for delayed delivery (0.1%-0.3% of the contract amount per day).
- Acceptance Criteria
- The technical parameters written into the contract (such as pressure value, production capacity) must be accompanied by testing methods.
- one month after trial production .
- intellectual property
- If customized molds/formulas are involved, the ownership of the design copyright must be agreed upon.
8. Other matters needing attention
- Suppliers are required to provide operation manuals (in Chinese and English) and fault code tables.
- Give priority to manufacturers that support equipment financial leasing to reduce financial pressure.
- Confirm local policies on subsidies for building materials production equipment (such as environmental protection technology improvement subsidies).
Recommended process : Demand analysis → Comparison of more than 3 suppliers → On-site inspection → Small-batch trial production → Contract signing
Tips to avoid pitfalls : Be cautious when purchasing equipment without nameplates. The factory number of the equipment is required and can be checked on the official website !